1944
Canadair is founded in Montreal
Canadair Limited comes into being on 11 November 1944, out of the Canadian Vickers aircraft plant at Cartierville Airport in Saint-Laurent, Montreal, after Vickers asks the Canadian government to relieve it of running the factory. Sources describe the legal mechanism differently — incorporation in one account, a management contract in another — but they agree on the date.
1963
Canada decides it needs a purpose-built water bomber
Until this point every water bomber in the world was a conversion: a wartime bomber or a bush plane with a tank bolted in, carrying the wrong load, handling badly, and with half its fatigue life already spent. Canadair had been studying a utility amphibian as a freighter and redirected the concept after forestry officials in Quebec asked for an aircraft built to carry water. In 1963 the National Research Council's Associate Committee on Forest Fire Protection agreed on the need. The specification that followed called for a multi-engine amphibian able to deliver up to 6,820 L (1,500 imp gal), filled either on the ground or by scooping from a lake or the sea.
1967
First flight of the CL-215
The prototype flies on 23 October 1967 — the first aircraft anywhere designed from a blank sheet of paper with water bombing as its primary role. Power comes from two Pratt & Whitney R-2800 twin-row piston radials of roughly 2,100–2,200 hp each.
1969
First delivery — to France
The first CL-215 is delivered in June 1969 to the French Protection Civile, today's Sécurité Civile, based at Marignane near Marseille. France goes on to operate 15 of them until 1996. Its previous water bombers had been converted Catalina flying boats, flown from 1963 to 1970; two of those were destroyed. It is the second loss — a training crash in November 1967 in which the pilot was killed and the body was not found until the next day — that made the crews trade their green military coveralls for the far more visible orange flight suits French water-bomber crews still wear.
1986
Canadair is privatised and sold to Bombardier
After the Canadian government nationalised Canadair in 1976 and then absorbed record losses on the Challenger business jet, the company is sold to Bombardier for C$120 million plus royalties. The enabling statute receives Royal Assent on 19 December 1986. The date often quoted, August 1986, is when the deal was announced; the exact closing date could not be confirmed.
1989
First flight of the turbine CL-215T
On 8 June 1989 a converted CL-215 flies with Pratt & Whitney Canada PW123AF turboprops in place of the piston radials, along with wingtip endplates, tailplane finlets, powered flying controls, higher weights and a foam injection system. Canadair decides not to build new CL-215Ts, selling conversion kits instead and putting its effort into an all-new aircraft. Spain takes the bulk of those kits and re-engines much of its own fleet from 1990, though published counts of how many differ.
1990
CL-215 production ends after 125 aircraft
Production ran from 1969 to 1990. Many of those airframes are still flying today, a number of them since converted to turbine power.
1993
First flight of the CL-415
The CL-415 flies on 6 December 1993. Against the turbine-converted CL-215T it adds a four-door drop system in place of two doors, an EFIS "glass" cockpit, a slightly larger tank, and higher weights and speeds. Moving the more powerful engines inboard, closer to the fuselage, upset the tail's behaviour, which is why the aircraft carries a small fixed slat, mounted upside down, ahead of its right-hand tailplane only.
1994
Certified — and delivered to France again
Transport Canada approves the type, formally the CL-215-6B11, on 24 June 1994, with European certification following on 27 October. First deliveries are in November 1994, once more to France's Sécurité Civile. French sources date their fleet's entry into service to 1995, which is compatible: delivery and entry into service are not the same event.
1994
Quebec starts lending Super Scoopers to Los Angeles
Under an agreement first struck in 1994, Quebec's government air service leases two CL-415s, with pilots and maintenance crews, to the Los Angeles County Fire Department each year from 1 September for three to six months — Quebec's fire season and Southern California's being conveniently out of phase. The programme is still running, and made headlines again during the January 2025 Los Angeles firestorm.
2015
Bombardier stops the line after 95 aircraft
In October 2015, with no orders to fill for the following year and a cash crisis caused by its CSeries airliner programme, Bombardier ends the line. The aircraft were assembled in Montreal and finished at North Bay, Ontario, and it is the North Bay completion centre that closes. The final total is 95 aircraft: 86 standard CL-415s, 6 CL-415GRs for Greece and 3 CL-415MP maritime patrol versions.
2016
Viking Air buys the programme
Viking Air announces on 20 June 2016 that it is buying the CL-215 and CL-415 type certificates from Bombardier, closing the deal on 3 October. It then launches the CL-415EAF, converting old piston CL-215 airframes to turbine power. Bridger Aerospace of Bozeman, Montana becomes launch customer in May 2018 with a US$204 million contract; the first converted aircraft flies on 9 March 2020.
2022
A new aircraft: the DHC-515 Firefighter
On 31 March 2022 De Havilland Canada launches the DHC-515 — essentially the same airframe brought back into production — with letters of intent for the first 22 aircraft from European customers. Final assembly is at Calgary, Alberta. In August 2024 the European Commission announces a fully EU-financed fleet of 12 amphibious firefighting aircraft under its civil protection mechanism.
2025–2026
Canadian provinces and European nations queue up
Manitoba commits C$80 million for three aircraft in April 2025, Ontario over C$500 million for six in November 2025, and Alberta C$400 million for five in February 2026. The Canadair name itself is already back: De Havilland revived it in October 2024, rebranding the aircraft the "De Havilland Canadair 515" on the grounds that a Canadair is what Europeans still ask for when a fire starts. In March 2026 the company reports the first wing box and forward fuselage complete. France doubles its own commitment in June 2026, ordering two more.
2028
First DHC-515 delivery planned — to Greece
At Farnborough in July 2026 De Havilland reports about 38 aircraft on order — six European nations, three Canadian provinces and Indonesia — with final assembly starting in 2026 and certification and first delivery targeted for 2028. Order totals have been reported inconsistently, from about 30 to 38. No first flight has taken place yet; the company says it is aiming for late 2027 or early 2028.